1995-1996 NIS Calibration Reports
This section contains Jimbo's 1995-1996 NEAR/NIS and MSI Calibration
information, with the more recent results at top.
NIS Calibration
Report #17 (7/12/96)
NIS "All-On" Test Results: Noise Induced by Other Instruments
NIS Calibration
Report #16 (5/8/96)
NIS Initial Turn-On Temperatures and Currents
Comet C/1996 B2 Observing Plans (3/12/96)
March 24 1996 15:00 UT MSI Comet Hyakutake Sequencing Outline
NIS Calibration Report #15 (2/23/96)
NIS Temperature Calibration
NIS Calibration Report #14 (11/28/95)
NIS Spectral Crosstalk, Report #2
NIS Calibration Report #13 (11/07/95)
NIS sample measurements online
NIS Calibration Report #12 (10/18/95)
Comparison between NIS and MSI sample measurements
NIS Calibration Report #11 (7/18/95)
Preliminary Ge and InGaAs radiometric calibration
NIS Calibration Report #10 (7/18/95)
Ge and InGaAs short-axis (spectral) profile scan results
NIS Calibration Report #9 (7/13/95)
Leakage of unblocked first-order signal onto Ge detector
NIS Calibration Report #8 (7/13/95)
Search for detector noise induced by NIS shutter
NIS Calibration Report #7 (7/13/95)
Better wavelength calibration for Ge and InGaAs detectors
NIS Calibration Report #6 (6/13/95)
Preliminary wavelength calibration for Ge and InGaAs detectors
NIS Calibration Report #5 (5/20/95)
Assessment of InGaAs SNR needs
NIS Calibration Report #4 (2/23/95)
Ge piece-part spectral responsivity
NIS Calibration Report #3 (2/22/95)
Ge piece-part linearity test data, at other temperatures
NIS Calibration Report #2 (2/2/95)
Ge piece-part dark current temperature sensitivity
NIS Calibration Report #1 (1/25/95)
Ge piece-part linearity test data, T=-26, vacuum
Click here to go back to the main NISCAL home page
For information contact Jim Bell
Mail to: jimbo@cuspif.tn.cornell.edu